TOS Dashboard
CHITTAGONG PORT AUTHORITY
TERMINAL OPERATING SYSTEM(TOS)
DASHBOARD

Statement of Booked Cargo Handling Equipment Position    Date: 26/04/2024

Sl. No. Type of Equipment Demand & Supply TM(CCT/NCT+GCB) DTM (Heavy Lift) Total
1 Crane 50 Ton Demand      
Supply      
2 Crane 30 Ton Demand      
Supply      
3 Crane 20 Ton Demand      
Supply      
4 Crane 10 Ton Demand      
Supply      
5 FLT 20 Ton Demand      
Supply      
6 FLT 10 Ton Demand      
Supply      
7 FLT 05 Ton Demand      
Supply      
8 FLT 03 Ton Demand      
Supply      
9 FLT 1.5 Ton Demand      
Supply      
10 RRC 05 Ton Demand      
Supply      
11 Tractor 25 Ton Demand      
Supply      
12 Heavy Trailer 25 Ton Demand      
Supply      
13 Light Trailer 06 Ton Demand      
Supply      
14 Car Carrier Demand      
Supply      
15 Tele Handler 04 Ton Demand      
Supply      
16 Pipe Handler 45 Ton Demand      
Supply      
17 Automatic Weighting & Bagging Machine Demand      
Supply      
18 Pneumatic Conveyor Demand      
Supply      
19 Variable Reach Stacker 16 Ton Demand      
Supply      
20   Demand      
Supply      


Total Cargo Handling Equipment Position

SL. No. Type of Equipment Total Equipment Total Operational Out Of Order Others Workshop Remarks
Supplied Stand By